| Fee rate of tap water (including discharge fee) |
¢Ł
Water for industrial use( including establishments, institutions and public bathing pools): RMB 4.1 Yuan/ cubic meters
¢ŚWater for residential use(including armies and schools): RMB 2.9 Yuan/ cubic meters
¢ŪWater for business and tourist industry( including recreational areas and tourist spots): RMB 5.9 Yuan/ cubic meters
¢ÜWater for temporary use: RMB 4.5 Yuan/ ton |
| Classification |
kilowatt -hour electricity price(RMB Yuan / kilowatt-hour ) |
Basic electricity price |
| <1KV |
1-10KV |
35-66KV |
110KV |
”Ż220KV |
Max demand |
Transformer capacity |
| Electricity for Residential use |
0.450 |
0.440 |
0.440 |
|
|
Yuan/KW/Month |
Yuan/KVA/Month |
| Electricity for Non-Residen-tial use |
0.740 |
0.730 |
0.730 |
|
|
|
|
| Electricity for Commercial use |
0.836 |
0.816 |
0.816 |
|
|
|
|
| Electricity for Non industry, ordinary industry use, among which: medium and small scale chemical fertilizer productions |
0.702 |
0.692 |
0.682 |
|
|
|
|
| 0.560 |
0.550 |
0.540 |
|
|
|
|
| Electricity for large scale industries |
|
0.445 |
0.432 |
0.419 |
0.409 |
28.00 |
19.00 |
| calcium carbide, electrolytic caustic soda, synthesis ammonia, electric furnace- yellow phosphorus |
|
0.435 |
0.422 |
0.409 |
0.399 |
28.00 |
19.00 |
| medium and small scale chemical fertilizer productions |
|
0.343 |
0.330 |
0.317 |
|
22.00 |
15.00 |
| Electricity for agricultural production |
0.400 |
0.390 |
0.380 |
|
|
|
|
|
1 Ӣ
Main indicators
|
Technology: liquefied gas mixed with air
Calorific value: 34.1MJ/Nm3 £Ø 8150Kca//Nm3 £©
Gas pressure of medium-pressure pipe network: 0.09Mpa
Feature : safe, clean, stable and high efficient |
| 2 Ӣ
Price
|
Price of gas for residential use: RMB 2.00 Yuan/ m3
Price of gas for industrial use: RMB 5.80 Yuan/ m3
Price of gas for commercial use: RMB 5.80 Yuan/ m3 |
|
Price of heating for residential use: RMB 20 Yuan/ m 2 (building area) for each heating period |
Price of heating for business enterprises and other units: RMB 32.5 Yuan/ m 2 (building area with a height of 3.8m) for each heating period. |
|
The price for steam is RMB 125 Yuan/ton( according to the cubic meters of steam) , and any fraction of four tons a day shall be counted as four tons (The pressure of steam supplied is 0.6~0.8Mpa, and the saturation temperature shall be 164”ę when the pressure is over 0.6Mpa. |
Central heating supply is available in the south area of DD Port, hot water heat supplying pipe network and steam network are connected to user red lines, and the fee rate based on heating area shall be determined according to that for Dalian Economy & Technology Development Zone. |
|
There's no telephone distribution box in DD Port, and the lines between user's room and distri-bution box shall be arranged by a telecommunication office, and users shall bear relevant charges. |
|
|